Built for SAP ECC 6.0 · Plant Maintenance

Plan the job.
Skip the blank sheet.

Planwise Bench drafts SAP work orders and task lists from a plain-language job description, complete with steps, crafts, hours, materials, and safety notes, then exports clean Excel for SAP ECC 6.0: LSMW, Winshuttle, or straight paste into SAP GUI.

Runs in your browser. Never connects to SAP. You approve every line.

How it works

Four steps from a rough scope to an upload-ready file.

  1. 1

    Describe

    Type the job or paste a rough scope or notification. Add the functional location and long text if you have them.

  2. 2

    Draft

    Get a sequenced plan with operations, crafts, hours, materials, and safety notes.

  3. 3

    Review

    Edit anything in a spreadsheet-style grid. Undo, reset, reorder. You approve every line.

  4. 4

    Export

    Download SAP-ready Excel and a printable work pack.

Drafts that think like a planner

Proven sequence

Prepare, make ready, isolate, verify, execute, test, restore, close out.

Catches forgotten steps

Scaffold removal, isolation verification, leak tests, and loop checks are flagged when missing.

Your codes, not generic ones

Load your own work centers, control keys, and material numbers so drafts match your system.

Upload-ready Excel

Column-mapped, validated workbooks for LSMW and Winshuttle, plus flat text files.

Reusable task lists

Turn a good plan into a standard task list for next time.

Built around the equipment

Pick the equipment type and get tasks, intervals, and safety flags that fit, including a full PM plan structure.

Undo, reset, copy, paste

Change anything without fear. Undo every step, reset to the original draft, copy to and from Excel and SAP.

Built for SAP ECC 6.0

Layouts follow classic PM transactions: IA01, IA05, IA11, IP41–IP43, and IW31.

You stay in control

Nothing touches SAP. You review, export, and load on your terms.

Sample work pack

Planner input: Pull the flow probes on FT-101, clean and calibrate, reinstall. Elevated, needs scaffold. Hydrogen service.

OpWork CtrDescriptionNo.Dur (H)Work (H)
0010OPSFT-101 Job safety analysis / permit14.04.0
0020SCAFFT-101 Build scaffold420.080.0
0030OPSFT-101 Isolate, depressure, and purge line14.04.0
0040MECHFT-101 Joint walk-down / verify isolation10.50.5
0050MECHFT-101 Remove probes22.04.0
0060INSTFT-101 Inspect, clean, and calibrate probes24.08.0
0070MECHFT-101 Reinstall probes22.04.0
0080MECHFT-101 Nitrogen / service leak test21.02.0
0090INSTFT-101 Return to service / loop check11.01.0
0100SCAFFT-101 Dismantle scaffold48.032.0

Agent review flags

  • Added scaffold dismantle step (0100); the original scope had no removal step.
  • Safety: flammable gas service. Confirm gas test, purge acceptance criteria, and permit type per site procedure.
  • QA/QC: leak test (0080) and loop check (0090) marked as hold points.
  • Materials: gasket set and probe seals suggested; planner adds material numbers.
  • Repeat work: save as a standard task list for this probe type.

Generic example. Work center codes, durations, and crew sizes are illustrative.

Export your way

LSMW batch input

Columns in ECC create-screen field order, plus an optional tab-delimited text file.

Winshuttle

Column-mapped, validated workbooks ready for your Winshuttle scripts.

SAP GUI paste

Copy any field on its own, with long text wrapped to 72 characters.

Target: SAP ECC 6.0 EHP8 (SAP_APPL 618, SAP_BASIS 750) with SAP GUI for Windows 8.00. S/4HANA layouts may come in a later release.

FAQ

Does Planwise Bench connect to SAP?

No. It produces Excel files. You load them with your own approved tools.

Will the drafts be correct for my site?

Drafts are a starting point. Load your reference data and review every line before export.

Which SAP versions are supported?

SAP ECC 6.0 (EHP8) Plant Maintenance with SAP GUI for Windows. S/4HANA layouts may come in a later release.

Is my data private?

Saved plans and reference lists belong to your account. Only paste information you are permitted to share.

Is there an app?

No. Planwise Bench runs in any modern browser.

Is it an Excel file?

No. Planning happens in the web app. Excel is the export you download after review.